Speedy Construction Project

I responded to a comment left by a reader regarding the progress on our construction to date. It got me thinking about just how much time the project has been underway, so I went to the archives and took a look at the groundbreaking photos and then to the latest ones taken last Saturday.

The composite image below shows the groundbreaking on August 16, 2010 and the state of the project when we left Wickenburg last Saturday, October 9, 2010. That’s just a little under two months and the concrete, framing, drywall, rough electrical and plumbing, windows, doors and insulation are all done. That’s not too shabby.

Click on the image to enlarge.

two-months.jpg

Weekday BBQ

impromptu.jpgVerna and I generally make our special meals on weekends. Now, since we’ve been on the road dealing with the new house, we have been traveling on the weekends.

We almost never eat in restaurants, so while out of town, we shop at a local supermarket and fix meals at the hotel or in the park down the street on our portable grill.

I missed cooking on my big grill, so today, I pulled a couple of small tenderloins out of the freezer and grilled ’em to medium rare. At DrJim’s recommendation, we had roasted yam spears seasoned with sodium-free “bayou blast” (made from an Emeril Lagasse concoction but without the salt). We opened a can of butter beans for some extra roughage. It was a very tasty meal.

Parting Shot

I took this picture of our newly installed front door and my husband just as we were getting ready to head back to California. The project is going very well and we need to take care of some business at the Torrance house but we’ll be back in Arizona soon. Click on the image to enlarge.

parting-shot.jpg

RV Access Panorama

We asked our contractor to clear a pathway so that when we get our RV we can have pull-thru access. I have a problem with trying to back a large vehicle (trailer/5th wheel/class A) up or downhill, so we asked for the pull-thru access.

In the panoramic image below on the left side, you can see the rough exit access. The RV will enter the driveway on the right side and pull behind the house where there will be full hookups (30 Amp AC, hose bib, sewer) on the left side. Click on the image to enlarge.

house-pan-20101008a.jpg

We only needed the RV space for storage of the one we may eventually get. We wouldn’t necessarily need the hookups but if we get visitors who come in an RV, we wanted them to have the option to stay in their rig. We will pull ours down the exit access enough to allow our visitors to pull behind the house. When they are ready to leave, we will pull down on the roadway and drive up the driveway and into the RV spot as they pull out.

Preview of the Next Phase

other-house.jpgThe house under construction that we visited Tuesday is the exact same floor plan and exterior style as the one we’re having built. The only difference between the two is the orientation and size of the garage. Our garage door faces toward the driveway on the right and this one faces front.

Our house is at a stage where the inside and outside paint and textures along with the cabinet installation have yet to be completed. All of those are finished on the other house except for the exterior paint.

While I stood in front of the other house, I took a couple of images which I later stitched into this panoramic composite view. Click on the image to enlarge.

Kitchen Cabinet Selection

Yesterday, our contractor took us to another new build to show us the custom cabinets installed there. Without much deliberation, we decided to have him install this exact style and finish. Click on the image to enlarge.

cabinets.jpg