The truck arrived this morning and pumped the concrete into the trench for the wall footing. You can see the rebar with protective caps rising from the footing in the image. The next stage will be the delivery of the concrete blocks and then masonry to stack the blocks up and grout them in place. Click on the image to enlarge.